What the clause requires

When the company decides to change the quality management system, by reorganising processes, replacing the management software, outsourcing an activity or changing the structure, clause 6.3 asks for the change to be carried out in a planned manner. Before execution, the company considers the purpose of the change and its potential consequences, the integrity of the quality management system, the availability of resources, and the allocation or reallocation of responsibilities and authorities. Those are four questions asked before the change rather than after it, and the standard does not prescribe a form: a short record of the discussion is acceptable for a small change.

The purpose is to stop a well-intentioned change from breaking controls that were working. Replacing the ERP is the classic example: if nobody planned how the inspection records and the traceability data would migrate, the company finds out during the audit that six months of evidence are gone. The same happens with a restructuring that leaves a process without an owner, or with an outsourcing decision that moves an activity outside the building and forgets to move the controls with it. None of this is exotic; it is the predictable consequence of changing one part of a system without looking at the parts attached to it.

Clause 6.3 deals with changes to the system. Changes in the operation, such as a change of material, a change to the production process or a change to a design, are handled by the operational controls, mainly in clauses 8.1 and 8.5.6. In practice many companies use the same change management form for both situations, with a simple risk assessment, a list of the documents and records affected and an action plan. That is usually enough, provided the form is filled in before the change and reviewed afterwards.

What the auditor asks to see

Where companies most often get it wrong

Example of a nonconformity

Illustrative example, in the requirement, evidence and statement format
Requirement
ISO 9001, 6.3: changes to the quality management system shall be carried out in a planned manner, considering the integrity of the system.
Evidence
In 03/2026 the company replaced its management software. There is no plan for the change, and the incoming inspection records from 01 to 03/2026 remained in the old system, with no current access to them.
Finding
The change to the system was not planned and compromised the availability of documented information.

How to comply using PrismaBiz

Ready-made templates for this clause

Frequently asked questions

Does every change need a form?

No. The standard asks for planning that is proportionate. Simple changes can be planned in a recorded meeting; large ones deserve a risk assessment and an action plan.

What is the difference between 6.3 and 8.5.6?

Clause 6.3 covers changes to the quality management system. Clause 8.5.6 covers changes in production or service provision, such as a change of process or of material.

How do I evidence that a change was planned?

With the record of what was decided beforehand: purpose, risks assessed, people responsible, deadlines and resources, plus the verification afterwards.

Related clauses

Does your company comply with ISO 9001 6.3?

Ask for a free assessment: tell us where you stand and when the audit is. We answer with the practical path and what to use in PrismaBiz.

We use your data to reply to your assessment and send PrismaBiz content, as described in our Privacy Policy. You can unsubscribe at any time.

Manage this in PrismaBiz, free

22 das 32 ferramentas são grátis para sempre, sem cartão.

Create free account → See the free tools